The insulation people are over at the house. When I was there about 8, they were trying to heat up the house (there is a minimum temperature at which the spray foam insulation can be done) and covering our beautiful new windows.
Yes, this means we still don't have heat. Elliott, the plumber and I have been calling both Xcel and the County to get the gas turned back on, and it has been an extremely frustrating and long experience. We absolutely have to have heat for drywall mud so that it dries evenly.
Current schedule:
Insulation today
Insulation inspection tomorrow
Drywall on Friday
We finished all our pre drywall tasks about 10 last night. Eric and I are tired. Eric is off to Spokane for a meeting today. He will be back on Friday. The original schedule had drywall on Thursday, and I told him I was going to have to go over and see it before he got back on Friday. He gets back at 3 on Friday, which means he can't be in Boulder til about 4:30. We will see if I can wait that long to go over. Not likely. We are both super excited to get drywall!
No comments:
Post a Comment